DAC5674EVM

Mfr. #: DAC5674EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DAC5674
Lifecycle: New from this manufacturer.
Datasheet: DAC5674EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5674EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5674.

DAC5674EVM Image

DAC5674EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5674EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5674

DAC5674EVM

DAC5674EVM Specifications

DAC5674EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5674.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$28.64
$28.64
10
$27.20
$272.03
100
$25.77
$2 577.15
500
$24.34
$12 169.90
1000
$22.91
$22 908.00
Top