DAC5689EVM

Mfr. #: DAC5689EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DAC5689
Lifecycle: New from this manufacturer.
Datasheet: DAC5689EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5689EVM Overview

This product is categorized as Evaluation Modules Type: DAC This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5689. USB interface type

DAC5689EVM Image

DAC5689EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5689EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Modules
  • Type DAC
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5689
  • Interface-Type USB

DAC5689EVM

DAC5689EVM Specifications

DAC5689EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5689.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$560.79
$560.79
10
$532.75
$5 327.50
100
$504.71
$50 471.10
500
$476.67
$238 335.75
1000
$448.63
$448 632.00
Top