DAC7574EVM

Mfr. #: DAC7574EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR DAC7574
Lifecycle: New from this manufacturer.
Datasheet: DAC7574EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7574EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC7574. I2C interface type

DAC7574EVM Image

DAC7574EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7574EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC7574
  • Interface-Type I2C

DAC7574EVM

DAC7574EVM Specifications

DAC7574EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC7574.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top