DAC8168EVM

Mfr. #: DAC8168EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DAC8168
Lifecycle: New from this manufacturer.
Datasheet: DAC8168EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8168EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC8168. SPI interface type

DAC8168EVM Image

DAC8168EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8168EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC8168
  • Interface-Type SPI

DAC8168EVM

DAC8168EVM Specifications

DAC8168EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.7 V to 5.5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8168.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$9.42
$9.42
10
$8.95
$89.49
100
$8.48
$847.80
500
$8.01
$4 003.50
1000
$7.54
$7 536.00
Top