DAC8760EVM

Mfr. #: DAC8760EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD 16BIT DAC
Lifecycle: New from this manufacturer.
Datasheet: DAC8760EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8760EVM Overview

Product belongs to the DAC8760 series. This product is categorized as Evaluation Kits Type: DAC Bulk is the packaging method for this product This product is designed DAC8760 amplifier. This product is an Complete evaluation kit that includes a USB-based motherboard and software. This tool is designed for the DAC8760. USB interface type

DAC8760EVM Image

DAC8760EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8760EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC8760
  • Product Evaluation Kits
  • Type DAC
  • Packaging Bulk
  • For-Use-With DAC8760
  • Description-Function Complete evaluation kit that includes a USB-based motherboard and software
  • Tool-Is-For-Evaluation-Of DAC8760
  • Interface-Type USB

DAC8760EVM

DAC8760EVM Specifications

DAC8760EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DAC8760

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DAC8760.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Complete evaluation kit that includes a USB-based motherboard and software.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8760.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$212.23
$212.23
10
$201.62
$2 016.20
100
$191.01
$19 100.84
500
$180.40
$90 198.40
1000
$169.79
$169 785.20
Top