DRV10964EVM

Mfr. #: DRV10964EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE
Lifecycle: New from this manufacturer.
Datasheet: DRV10964EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV10964EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers This product is designed TLC555 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3-Ph Brushless DC (BLDC) Motors IC package type: DRV10964 Output voltage: 7.5 V This product is an DRV10964 three-phase brushless motor driver. This tool is designed for the DRV10964. Input Voltage Range: 2.1 V to 5.5 V Output current: 500 mA

DRV10964EVM Image

DRV10964EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV10964EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • For-Use-With TLC555
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3-Ph Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV10964
  • Output-Voltage 7.5 V
  • Description-Function DRV10964 three-phase brushless motor driver
  • Tool-Is-For-Evaluation-Of DRV10964
  • Input-Voltage 2.1 V to 5.5 V
  • Output-Current 500 mA

DRV10964EVM

DRV10964EVM Specifications

DRV10964EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TLC555.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3-Ph Brushless DC (BLDC) Motors.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV10964.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 7.5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed DRV10964 three-phase brushless motor driver

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV10964.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.1 V to 5.5 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 500 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top