DRV10975EVM

Mfr. #: DRV10975EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE DRV10975
Lifecycle: New from this manufacturer.
Datasheet: DRV10975EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV10975EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV10975 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV10975 This product is an Evaluation module including its hardware implementation jumper configuration and operating procedure to run 3-phase BLDC motors. This tool is designed for the DRV10975. I2C USB interface type Input Voltage Range: 12 V

DRV10975EVM Image

DRV10975EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV10975EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV10975
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV10975
  • Description-Function Evaluation module including its hardware implementation jumper configuration and operating procedure to run 3-phase BLDC motors
  • Tool-Is-For-Evaluation-Of DRV10975
  • Interface-Type I2C USB
  • Input-Voltage 12 V

DRV10975EVM

DRV10975EVM Specifications

DRV10975EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DRV10975.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV10975

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation module including its hardware implementation jumper configuration and operating procedure to run 3-phase BLDC motors

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV10975

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C USB

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 12 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$148.50
$148.50
10
$141.08
$1 410.75
100
$133.65
$13 365.00
500
$126.22
$63 112.50
1000
$118.80
$118 800.00
Top