DRV593EVM

Mfr. #: DRV593EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR DRV593
Lifecycle: New from this manufacturer.
Datasheet: DRV593EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV593EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers The Power Management, Half H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: - IC package type: DRV593 This tool is designed for the DRV593 DRV594. Input Voltage Range: 2.8 V to 5.5 V

DRV593EVM Image

DRV593EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV593EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Gate Drivers
  • Main-Purpose Power Management, Half H-Bridge Driver (Internal FET)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV593
  • Tool-Is-For-Evaluation-Of DRV593 DRV594
  • Input-Voltage 2.8 V to 5.5 V

DRV593EVM

DRV593EVM Specifications

DRV593EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Gate Drivers.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Half H-Bridge Driver (Internal FET).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV593

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV593 DRV594.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 2.8 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$148.50
$148.50
10
$141.08
$1 410.75
100
$133.65
$13 365.00
500
$126.22
$63 112.50
1000
$118.80
$118 800.00
Top