| Mfr. #: | DRV612EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE FOR DRV612 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | DRV612EVM Datasheet |


Product belongs to the DirectPath series. Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV612 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV612.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV612EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DirectPath.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Output-Type?
Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 3 V ~ 3.6 V
A: What is the Max-Output-Power-x-Channels-Load of the product?
Q: The Max-Output-Power-x-Channels-Load of the product is -.
A: At what frequency does the Amplifier-Type?
Q: The product Amplifier-Type is Class AB.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV612
A: At what frequency does the Board-Type?
Q: The product Board-Type is Fully Populated.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV612.