DRV8307EVM

Mfr. #: DRV8307EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD MOTOR DRIVER DRV8307
Lifecycle: New from this manufacturer.
Datasheet: DRV8307EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8307EVM Overview

Product belongs to the DRV8307 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8307 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brushless DC (BLDC) Motors IC package type: DRV8307 Output voltage: 5 V This product is an Solution for evaluating the DRV8307 a brushless DC motor controller. This tool is designed for the DRV8307. Input Voltage Range: 8.5 V Output current: 30 mA

DRV8307EVM Image

DRV8307EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8307EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8307
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8307
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV8307
  • Output-Voltage 5 V
  • Description-Function Solution for evaluating the DRV8307 a brushless DC motor controller
  • Tool-Is-For-Evaluation-Of DRV8307
  • Input-Voltage 8.5 V
  • Output-Current 30 mA

DRV8307EVM

DRV8307EVM Specifications

DRV8307EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV8307.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed DRV8307

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Brushless DC (BLDC) Motors.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8307.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Solution for evaluating the DRV8307 a brushless DC motor controller

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8307

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 8.5 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 30 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$86.85
$86.85
10
$82.51
$825.08
100
$78.16
$7 816.50
500
$73.82
$36 911.25
1000
$69.48
$69 480.00
Top