DRV8313EVM

Mfr. #: DRV8313EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE DRV8313
Lifecycle: New from this manufacturer.
Datasheet: DRV8313EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8313EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8313 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3 Half Bridge Drivers IC package type: DRV8313 This tool is designed for the DRV8313. USB interface type Input Voltage Range: 8 V to 48 V

DRV8313EVM Image

DRV8313EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8313EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8313
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3 Half Bridge Drivers
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8313
  • Tool-Is-For-Evaluation-Of DRV8313
  • Interface-Type USB
  • Input-Voltage 8 V to 48 V

DRV8313EVM

DRV8313EVM Specifications

DRV8313EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8313.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 3 Half Bridge Drivers

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8313.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8313

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 8 V to 48 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$114.63
$114.63
10
$108.90
$1 088.98
100
$103.17
$10 316.70
500
$97.44
$48 717.75
1000
$91.70
$91 704.00
Top