| Mfr. #: | DRV8803EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE FOR DRV8803 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | DRV8803EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Modules The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: 1.5A @ 1 Channel, 800mA @ 4 Channels IC package type: DRV8803 Maximum operating temperature of + 85 C This tool is designed for the DRV8803. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8803EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Motor Control, Stepper.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is 1.5A @ 1 Channel, 800mA @ 4 Channels.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is DRV8803.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV8803.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is USB.