DRV8812EVM

Mfr. #: DRV8812EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DRV8812
Lifecycle: New from this manufacturer.
Datasheet: DRV8812EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8812EVM Overview

Product belongs to the - series. This product is categorized as Development Tools The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV8812 This product is an Evaluation Module. This tool is designed for the DRV8812.

DRV8812EVM Image

DRV8812EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8812EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Development Tools
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV8812
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of DRV8812

DRV8812EVM

DRV8812EVM Specifications

DRV8812EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Development Tools.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8812

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation Module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8812.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$223.50
$223.50
10
$212.32
$2 123.25
100
$201.15
$20 115.00
500
$189.98
$94 987.50
1000
$178.80
$178 800.00
Top