DRV8824EVM

Mfr. #: DRV8824EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DRV8824
Lifecycle: New from this manufacturer.
Datasheet: DRV8824EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8824EVM Overview

Product belongs to the - series. This product is categorized as Development Tools Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: - IC package type: DRV8824 This product is an Evaluation Module. This tool is designed for the DRV8824.

DRV8824EVM Image

DRV8824EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8824EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Development Tools
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV8824
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of DRV8824

DRV8824EVM

DRV8824EVM Specifications

DRV8824EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Development Tools.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control, Stepper

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8824

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation Module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8824.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top