DRV8830EVM

Mfr. #: DRV8830EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DRV8830
Lifecycle: New from this manufacturer.
Datasheet: DRV8830EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8830EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver, 1A IC package type: DRV8830 This tool is designed for the DRV8830. I2C interface type Output current: 1 A

DRV8830EVM Image

DRV8830EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8830EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver, 1A
  • Embedded No
  • Utilized-IC-Part DRV8830
  • Tool-Is-For-Evaluation-Of DRV8830
  • Interface-Type I2C
  • Output-Current 1 A

DRV8830EVM

DRV8830EVM Specifications

DRV8830EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Single-H-Bridge Driver, 1A.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8830.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8830.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 1 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top