FDC1004EVM

Mfr. #: FDC1004EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Touch Sensor Development Tools FDC1004 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: FDC1004EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
FDC1004EVM Overview

Product belongs to the FDC1004 series. This product is categorized as Evaluation Kits Type: Capacitive Touch Proximity Sensors Bulk is the packaging method for this product Sensitivity: - Interface: - Voltage Supply Range: 5V, USB Touch, Capacitive Sensing range of 2 Buttons/Keys Included item: Board. IC package type: FDC1004 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the FDC1004. I2C interface type

FDC1004EVM Image

FDC1004EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FDC1004EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series FDC1004
  • Product Evaluation Kits
  • Type Capacitive Touch Proximity Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface -
  • Voltage-Supply 5V, USB
  • Sensor-Type Touch, Capacitive
  • Sensing-Range 2 Buttons/Keys
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part FDC1004
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of FDC1004
  • Interface-Type I2C

FDC1004EVM

FDC1004EVM Specifications

FDC1004EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is FDC1004.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Capacitive Touch Proximity Sensors

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: What is the Interface of the product?

    Q: The Interface of the product is -.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 5V, USB.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Touch, Capacitive.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed 2 Buttons/Keys

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is FDC1004.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed FDC1004

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$43.50
$43.50
10
$41.32
$413.25
100
$39.15
$3 915.00
500
$36.98
$18 487.50
1000
$34.80
$34 800.00
Top