GC6016EVM

Mfr. #: GC6016EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR GC6016
Lifecycle: New from this manufacturer.
Datasheet: GC6016EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
GC6016EVM Overview

Compatible with GC6016. Product belongs to the - series. Type: Signal Processor This product's 900MHz ~ 2.7GHz range is 0Hz to 2.2GHz. Included item: Board, Adapter, Cable, Power Supply, Switch.

GC6016EVM Image

GC6016EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

GC6016EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products GC6016
  • Series -
  • Type Signal Processor
  • Frequency 900MHz ~ 2.7GHz
  • Supplied-Contents Board, Adapter, Cable, Power Supply, Switch

GC6016EVM

GC6016EVM Specifications

GC6016EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is GC6016.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Type of the product?

    Q: The Type of the product is Signal Processor.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 900MHz ~ 2.7GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Adapter, Cable, Power Supply, Switch.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top