HDC1000EVM

Mfr. #: HDC1000EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Temperature Sensor Development Tools HDC1000 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: HDC1000EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
HDC1000EVM Overview

Product belongs to the HDC1000 series. This product is categorized as Evaluation Kits Type: Humidity Temperature Sensors Sensitivity: ±0.2°C, ±3% Interface: I2C Voltage Supply Range: - Humidity, Temperature Sensing range of -20°C ~ 85°C, 0 ~ 100% RH Included item: Board. IC package type: HDC1000 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the HDC1000. I2C USB interface type

HDC1000EVM Image

HDC1000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HDC1000EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series HDC1000
  • Product Evaluation Kits
  • Type Humidity Temperature Sensors
  • Sensitivity ±0.2°C, ±3%
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Humidity, Temperature
  • Sensing-Range -20°C ~ 85°C, 0 ~ 100% RH
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part HDC1000
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of HDC1000
  • Interface-Type I2C USB

HDC1000EVM

HDC1000EVM Specifications

HDC1000EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is HDC1000.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: At what frequency does the Type?

    Q: The product Type is Humidity Temperature Sensors.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±0.2°C, ±3%

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Humidity, Temperature

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -20°C ~ 85°C, 0 ~ 100% RH.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is HDC1000.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is HDC1000.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$32.58
$32.58
10
$30.95
$309.51
100
$29.32
$2 932.20
500
$27.69
$13 846.50
1000
$26.06
$26 064.00
Top