INA220EVM

Mfr. #: INA220EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR INA220
Lifecycle: New from this manufacturer.
Datasheet: INA220EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA220EVM Overview

Product belongs to the - series. The Power Management, Current Monitor is the Main-Purpose. Primary-Attributes: Current Shunt Monitor IC package type: INA220 This product operates at a 6 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the INA220.

INA220EVM Image

INA220EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA220EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Power Management, Current Monitor
  • Primary-Attributes Current Shunt Monitor
  • Embedded No
  • Utilized-IC-Part INA220
  • Operating-Supply-Voltage 6 V
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of INA220

INA220EVM

INA220EVM Specifications

INA220EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Current Monitor

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Current Shunt Monitor

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is INA220.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 6 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation Module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is INA220.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$223.50
$223.50
10
$212.32
$2 123.25
100
$201.15
$20 115.00
500
$189.98
$94 987.50
1000
$178.80
$178 800.00
Top