KITSTARTER2EVM

Mfr. #: KITSTARTER2EVM
Manufacturer: NXP Semiconductors
Description: Sensor Development Tools Multiple Function Sensor Development Tools SENSOR TOOLBX MB
Lifecycle: New from this manufacturer.
Datasheet: KITSTARTER2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
KITSTARTER2EVM Overview

Product belongs to the - series. Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Accelerometer, Capacitive Touch, Pressure Sensing range of - Included item: 8 Boards, Cables. IC package type: MMA88450Q, MPL115A, MPR121 This tool is designed for the KITMPR121EVM LFSTBEB8450 LFSTBUSB KITMPL115A1EVB KITPRESSURE1EVB.

KITSTARTER2EVM Image

KITSTARTER2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

KITSTARTER2EVM Specifications
  • Manufacturer Freescale Semiconductor - NXP
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Accelerometer, Capacitive Touch, Pressure
  • Sensing-Range -
  • Supplied-Contents 8 Boards, Cables
  • Embedded Yes, Other
  • Utilized-IC-Part MMA88450Q, MPL115A, MPR121
  • Tool-Is-For-Evaluation-Of KITMPR121EVM LFSTBEB8450 LFSTBUSB KITMPL115A1EVB KITPRESSURE1EVB

KITSTARTER2EVM

KITSTARTER2EVM Specifications

KITSTARTER2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed USB

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 5V, USB.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Accelerometer, Capacitive Touch, Pressure

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 8 Boards, Cables.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is MMA88450Q, MPL115A, MPR121.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is KITMPR121EVM LFSTBEB8450 LFSTBUSB KITMPL115A1EVB KITPRESSURE1EVB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top