LDC1101EVM

Mfr. #: LDC1101EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD FOR LDC1101
Lifecycle: New from this manufacturer.
Datasheet: LDC1101EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1101EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product This product is designed LDC1101 LP5951 MSP430F5528 amplifier. The Interface, Inductance-to-Digital Converter is the Main-Purpose. Primary-Attributes: - IC package type: LDC1101 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This product is an Evaluation board for 1.8 V high resolution inductance to digital converter. This tool is designed for the LDC1101. SPI USB interface type

LDC1101EVM Image

LDC1101EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1101EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Inductance to Digital
  • Packaging Bulk
  • For-Use-With LDC1101 LP5951 MSP430F5528
  • Main-Purpose Interface, Inductance-to-Digital Converter
  • Primary-Attributes -
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1101
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Description-Function Evaluation board for 1.8 V high resolution inductance to digital converter
  • Tool-Is-For-Evaluation-Of LDC1101
  • Interface-Type SPI USB

LDC1101EVM

LDC1101EVM Specifications

LDC1101EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Inductance to Digital

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed LDC1101 LP5951 MSP430F5528

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Inductance-to-Digital Converter.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LDC1101.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation board for 1.8 V high resolution inductance to digital converter

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LDC1101.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$43.50
$43.50
10
$41.32
$413.25
100
$39.15
$3 915.00
500
$36.98
$18 487.50
1000
$34.80
$34 800.00
Top