LDC1312EVM

Mfr. #: LDC1312EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR LDC1312
Lifecycle: New from this manufacturer.
Datasheet: LDC1312EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1312EVM Overview

Product belongs to the LDC1312 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1312 This tool is designed for the LCD1312.

LDC1312EVM Image

LDC1312EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1312EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LDC1312
  • Product Evaluation Modules
  • Type Inductance to Digital
  • Packaging Bulk
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Proximity, Inductive
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1312
  • Tool-Is-For-Evaluation-Of LCD1312

LDC1312EVM

LDC1312EVM Specifications

LDC1312EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LDC1312

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Inductance to Digital.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed USB

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 5V, USB.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Proximity, Inductive.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LDC1312.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LCD1312

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$33.57
$33.57
10
$31.89
$318.92
100
$30.21
$3 021.30
500
$28.53
$14 267.25
1000
$26.86
$26 856.00
Top