LM8330EVM

Mfr. #: LM8330EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD FOR LM8330
Lifecycle: New from this manufacturer.
Datasheet: LM8330EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM8330EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: I/O Expander This product is designed LM8330 amplifier. The Interface, Keyboard Scanner is the Main-Purpose. Primary-Attributes: - IC package type: LM8330 This product operates at a 1.8 V supply voltage for reliable performance. This product is an Helps designers evaluate the operation and performance of the LM8330. This tool is designed for the LM8330. I2C USB interface type

LM8330EVM Image

LM8330EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM8330EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type I/O Expander
  • For-Use-With LM8330
  • Main-Purpose Interface, Keyboard Scanner
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part LM8330
  • Operating-Supply-Voltage 1.8 V
  • Description-Function Helps designers evaluate the operation and performance of the LM8330
  • Tool-Is-For-Evaluation-Of LM8330
  • Interface-Type I2C USB

LM8330EVM

LM8330EVM Specifications

LM8330EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed I/O Expander

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LM8330.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Keyboard Scanner

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LM8330.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Helps designers evaluate the operation and performance of the LM8330.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LM8330

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$223.50
$223.50
10
$212.32
$2 123.25
100
$201.15
$20 115.00
500
$189.98
$94 987.50
1000
$178.80
$178 800.00
Top