LMT01EVM

Mfr. #: LMT01EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD FOR LMT01
Lifecycle: New from this manufacturer.
Datasheet: LMT01EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT01EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±0.5°C Interface: Digital Voltage Supply Range: 5V, USB Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LMT01 Maximum operating temperature of + 150 C Minimum operating temperature: - 50 C This product operates at a 5.5 V supply voltage for reliable performance. This tool is designed for the LMT01. 1-Wire interface type

LMT01EVM Image

LMT01EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT01EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±0.5°C
  • Interface Digital
  • Voltage-Supply 5V, USB
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LMT01
  • Maximum-Operating-Temperature + 150 C
  • Minimum-Operating-Temperature - 50 C
  • Operating-Supply-Voltage 5.5 V
  • Tool-Is-For-Evaluation-Of LMT01
  • Interface-Type 1-Wire

LMT01EVM

LMT01EVM Specifications

LMT01EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±0.5°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is Digital.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 5V, USB

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -50°C ~ 150°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LMT01.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 150 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 50 C

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5.5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LMT01.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed 1-Wire

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$30.00
$30.00
10
$28.50
$285.00
100
$27.00
$2 700.00
500
$25.50
$12 750.00
1000
$24.00
$24 000.00
Top