LMT84-7EVM

Mfr. #: LMT84-7EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Temperature Sensor Development Tools LMT84-7EVM Temp Sensor EVM
Lifecycle: New from this manufacturer.
Datasheet: LMT84-7EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT84-7EVM Overview

Product belongs to the LMT84 series. This product is categorized as Evaluation Boards Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: - Interface: Analog Voltage Supply Range: - Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LMT84, LMT85, LMT86, LMT87 Maximum operating temperature of + 150 C Minimum operating temperature: - 50 C This product operates at a 1.5 V to 5.5 V supply voltage for reliable performance. This tool is designed for the LMT84 LMT85 LMT86 LMT87.

LMT84-7EVM Image

LMT84-7EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT84-7EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LMT84
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface Analog
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LMT84, LMT85, LMT86, LMT87
  • Maximum-Operating-Temperature + 150 C
  • Minimum-Operating-Temperature - 50 C
  • Operating-Supply-Voltage 1.5 V to 5.5 V
  • Tool-Is-For-Evaluation-Of LMT84 LMT85 LMT86 LMT87

LMT84-7EVM

LMT84-7EVM Specifications

LMT84-7EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LMT84

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed Analog

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -50°C ~ 150°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LMT84, LMT85, LMT86, LMT87

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 150 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 50 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.5 V to 5.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LMT84 LMT85 LMT86 LMT87.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$33.57
$33.57
10
$31.89
$318.92
100
$30.21
$3 021.30
500
$28.53
$14 267.25
1000
$26.86
$26 856.00
Top