LOG114EVM

Mfr. #: LOG114EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR LOG114
Lifecycle: New from this manufacturer.
Datasheet: LOG114EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LOG114EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Operational temperature range: -5°C ~ 75°C Output-Type: - Voltage supply range: 5V The 5MHz The 5 V/μs. Current-Output-Channel is 18mA The amplifier is of Logarithmic type. Included item: Board. IC package type: LOG114 Board type: Fully Populated. The product has 1 - Single channel per IC. This product operates at a 1.15 V to 2.75 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the LOG114. 10 nA to 10 mA is 92 nA.

LOG114EVM Image

LOG114EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LOG114EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Operating-Temperature -5°C ~ 75°C
  • Output-Type -
  • Voltage-Supply-Single-Dual 5V
  • -3db-Bandwidth 5MHz
  • Slew-Rate 5 V/μs
  • Current-Output-Channel 18mA
  • Amplifier-Type Logarithmic
  • Supplied-Contents Board
  • Utilized-IC-Part LOG114
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 10mA
  • Operating-Supply-Voltage 1.15 V to 2.75 V
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of LOG114
  • Operating-Supply-Current 10 nA to 10 mA

LOG114EVM

LOG114EVM Specifications

LOG114EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Operating-Temperature?

    Q: The product Operating-Temperature is -5°C ~ 75°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed -

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 5V

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 5MHz

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 5 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 18mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Logarithmic.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LOG114.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.15 V to 2.75 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation Module

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LOG114.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 10 nA to 10 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top