LP8728EVM

Mfr. #: LP8728EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR LP8728
Lifecycle: New from this manufacturer.
Datasheet: LP8728EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8728EVM Overview

Product belongs to the LP8728 series. The DC/DC, Step Down is the Main-Purpose. 4.5 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 3.3MHz for optimal performance. Output voltage: 1.25V, 1.8V, 2.65V, 3.3V Buck regulator topology - Included item: Board. IC package type: LP8728 Board type: Fully Populated. The product has 4, Non-Isolated outputs.

LP8728EVM Image

LP8728EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8728EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series LP8728
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4.5 V ~ 5.5 V
  • Frequency-Switching 3.3MHz
  • Current-Output -
  • Voltage-Output 1.25V, 1.8V, 2.65V, 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part LP8728
  • Board-Type Fully Populated
  • Outputs-and-Type 4, Non-Isolated

LP8728EVM

LP8728EVM Specifications

LP8728EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LP8728

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed DC/DC, Step Down

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 4.5 V ~ 5.5 V

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 3.3MHz.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 1.25V, 1.8V, 2.65V, 3.3V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LP8728.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 4, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top