OPA1S2385EVM

Mfr. #: OPA1S2385EVM
Manufacturer: Texas Instruments
Description: MODULE EVAL FOR OPA1S2385
Lifecycle: New from this manufacturer.
Datasheet: OPA1S2385EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA1S2385EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Operational Amplifiers This product is designed OPA1S2385 amplifier. Operational temperature range: -40°C ~ 85°C Output-Type: Single-Ended, Rail-to-Rail Voltage supply range: 2.7 V ~ 5.5 V, ±1.35 V ~ 2.75 V The 250MHz The 150 V/μs. Current-Output-Channel is 100mA The amplifier is of Transimpedance type. Included item: Board. IC package type: OPA1S2385 Board type: Fully Populated. The product has 2 - Dual channel per IC. This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the OPA1S2385. SMA interface type

OPA1S2385EVM Image

OPA1S2385EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA1S2385EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Operational Amplifiers
  • For-Use-With OPA1S2385
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Single-Ended, Rail-to-Rail
  • Voltage-Supply-Single-Dual 2.7 V ~ 5.5 V, ±1.35 V ~ 2.75 V
  • -3db-Bandwidth 250MHz
  • Slew-Rate 150 V/μs
  • Current-Output-Channel 100mA
  • Amplifier-Type Transimpedance
  • Supplied-Contents Board
  • Utilized-IC-Part OPA1S2385
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC 9.8mA
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of OPA1S2385
  • Interface-Type SMA

OPA1S2385EVM

OPA1S2385EVM Specifications

OPA1S2385EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Operational Amplifiers.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is OPA1S2385.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Single-Ended, Rail-to-Rail.

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 2.7 V ~ 5.5 V, ±1.35 V ~ 2.75 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 250MHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 150 V/μs.

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed 100mA

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Transimpedance

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is OPA1S2385.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 2 - Dual.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is OPA1S2385.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top