OPA3695EVM

Mfr. #: OPA3695EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR OPA3695
Lifecycle: New from this manufacturer.
Datasheet: OPA3695EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA3695EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Operational Amplifiers Operational temperature range: -40°C ~ 85°C Output-Type: Single-Ended Voltage supply range: 5 V ~ 12 V, ±2.5 V ~ 6 V The 1GHz The 4300 V/μs. Current-Output-Channel is 120mA The amplifier is of Current Feedback type. Included item: Board. IC package type: OPA3695 Board type: Fully Populated. The product has 3 - Triple channel per IC. This product operates at a 5 V supply voltage for reliable performance. This product is an The OPA3695EVM is designed to quickly and easily demonstrate the functionality and versatility of the amplifier. This tool is designed for the OPA3695. 12.9 mA is 92 nA.

OPA3695EVM Image

OPA3695EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA3695EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Operational Amplifiers
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 5 V ~ 12 V, ±2.5 V ~ 6 V
  • -3db-Bandwidth 1GHz
  • Slew-Rate 4300 V/μs
  • Current-Output-Channel 120mA
  • Amplifier-Type Current Feedback
  • Supplied-Contents Board
  • Utilized-IC-Part OPA3695
  • Board-Type Fully Populated
  • Channels-per-IC 3 - Triple
  • Current-Supply-Main-IC 12.9mA
  • Operating-Supply-Voltage 5 V
  • Description-Function The OPA3695EVM is designed to quickly and easily demonstrate the functionality and versatility of the amplifier
  • Tool-Is-For-Evaluation-Of OPA3695
  • Operating-Supply-Current 12.9 mA

OPA3695EVM

OPA3695EVM Specifications

OPA3695EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Operational Amplifiers

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Single-Ended

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 5 V ~ 12 V, ±2.5 V ~ 6 V.

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is 1GHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 4300 V/μs.

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed 120mA

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Current Feedback

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is OPA3695.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 3 - Triple.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed The OPA3695EVM is designed to quickly and easily demonstrate the functionality and versatility of the amplifier

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed OPA3695

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 12.9 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$114.63
$114.63
10
$108.90
$1 088.98
100
$103.17
$10 316.70
500
$97.44
$48 717.75
1000
$91.70
$91 704.00
Top