OPA653EVM

Mfr. #: OPA653EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR OPA653
Lifecycle: New from this manufacturer.
Datasheet: OPA653EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA653EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: - Voltage supply range: ±3.5 V ~ 6.5 V The 500MHz The 2675 V/μs. Current-Output-Channel is 70mA The amplifier is of J-FET type. Included item: Board. IC package type: OPA653 Board type: Fully Populated. The product has 1 - Single channel per IC.

OPA653EVM Image

OPA653EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA653EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type -
  • Voltage-Supply-Single-Dual ±3.5 V ~ 6.5 V
  • -3db-Bandwidth 500MHz
  • Slew-Rate 2675 V/μs
  • Current-Output-Channel 70mA
  • Amplifier-Type J-FET
  • Supplied-Contents Board
  • Utilized-IC-Part OPA653
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 32mA

OPA653EVM

OPA653EVM Specifications

OPA653EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 85°C.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is -.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is ±3.5 V ~ 6.5 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 500MHz

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed 2675 V/μs

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 70mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is J-FET.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is OPA653.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top