OPT3001EVM

Mfr. #: OPT3001EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Optical Sensor Development Tools Ambient Light Sensor Eval Board
Lifecycle: New from this manufacturer.
Datasheet: OPT3001EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPT3001EVM Overview

Product belongs to the OPT3001 series. This product is categorized as Evaluation Modules Type: Ambient Light Sensors Bulk is the packaging method for this product Sensitivity: 550nm Interface: I2C Voltage Supply Range: 1.6 V ~ 3.6 V Light, Ambient Sensing range of - Included item: 2 Boards, Cable. IC package type: OPT3001 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 1.6 V to 3.6 V supply voltage for reliable performance. This product is an -. This tool is designed for the OPT3001. I2C USB interface type Our product measures - in dimensions for compact and convenient use.

OPT3001EVM Image

OPT3001EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT3001EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series OPT3001
  • Product Evaluation Modules
  • Type Ambient Light Sensors
  • Packaging Bulk
  • Sensitivity 550nm
  • Interface I2C
  • Voltage-Supply 1.6 V ~ 3.6 V
  • Sensor-Type Light, Ambient
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cable
  • Embedded -
  • Utilized-IC-Part OPT3001
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.6 V to 3.6 V
  • Description-Function -
  • Tool-Is-For-Evaluation-Of OPT3001
  • Interface-Type I2C USB
  • Dimensions -

OPT3001EVM

OPT3001EVM Specifications

OPT3001EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is OPT3001.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Ambient Light Sensors

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed 550nm

  • A: What is the Interface of the product?

    Q: The Interface of the product is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 1.6 V ~ 3.6 V.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Light, Ambient

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cable.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is OPT3001.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.6 V to 3.6 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is -.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is OPT3001.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C USB.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is -.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$28.95
$28.95
10
$27.50
$275.03
100
$26.06
$2 605.50
500
$24.61
$12 303.75
1000
$23.16
$23 160.00
Top