| Mfr. #: | PCM1860EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL BOARD FOR PCM1860 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | PCM1860EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Audio ADC This product is designed USB-I2X amplifier. The Audio, Audio Processing is the Main-Purpose. Primary-Attributes: Audio Front End IC package type: PCM1860 This product operates at a 5 V supply voltage for reliable performance. This product is an Evaluation board for the PCM186x family of ADCs. This tool is designed for the PCM1860. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1860EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Audio ADC
A: At what frequency does the For-Use-With?
Q: The product For-Use-With is USB-I2X.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Audio, Audio Processing.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is Audio Front End.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is PCM1860.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 5 V.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is Evaluation board for the PCM186x family of ADCs.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed PCM1860
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is USB.