PCM1861EVM

Mfr. #: PCM1861EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD AUDIO ADC PCM1861
Lifecycle: New from this manufacturer.
Datasheet: PCM1861EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM1861EVM Overview

Product belongs to the PCM1861 series. This product is categorized as Evaluation Modules Type: Audio ADC This product is designed PCM1861 amplifier. The Audio, Audio Processing is the Main-Purpose. Primary-Attributes: Audio Front End IC package type: PCM1861 This product operates at a 5 V supply voltage for reliable performance. This product is an Easy-to-use board for full evaluation of the four channel PCM1861 ADC. This tool is designed for the PCM1861. USB interface type

PCM1861EVM Image

PCM1861EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1861EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series PCM1861
  • Product Evaluation Modules
  • Type Audio ADC
  • For-Use-With PCM1861
  • Main-Purpose Audio, Audio Processing
  • Primary-Attributes Audio Front End
  • Embedded No
  • Utilized-IC-Part PCM1861
  • Operating-Supply-Voltage 5 V
  • Description-Function Easy-to-use board for full evaluation of the four channel PCM1861 ADC
  • Tool-Is-For-Evaluation-Of PCM1861
  • Interface-Type USB

PCM1861EVM

PCM1861EVM Specifications

PCM1861EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed PCM1861

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio ADC.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is PCM1861.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Audio, Audio Processing

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Audio Front End.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is PCM1861.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Easy-to-use board for full evaluation of the four channel PCM1861 ADC

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is PCM1861.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top