TAS5630PHD2EVM

Mfr. #: TAS5630PHD2EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TAS5630PHD2
Lifecycle: New from this manufacturer.
Datasheet: TAS5630PHD2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5630PHD2EVM Overview

Product belongs to the PurePath HD series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 25 V ~ 50 V Maximum Output Power of 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS5630 Board type: Fully Populated. This product operates at a 25 V to 50 V supply voltage for reliable performance. This tool is designed for the TAS5630PHD. 16 A is 92 nA. Our product measures 140 mm x 90 mm x 55 mm in dimensions for compact and convenient use.

TAS5630PHD2EVM Image

TAS5630PHD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5630PHD2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series PurePath HD
  • Product Evaluation Modules
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 25 V ~ 50 V
  • Max-Output-Power-x-Channels-Load 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Utilized-IC-Part TAS5630
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 25 V to 50 V
  • Tool-Is-For-Evaluation-Of TAS5630PHD
  • Operating-Supply-Current 16 A
  • Dimensions 140 mm x 90 mm x 55 mm

TAS5630PHD2EVM

TAS5630PHD2EVM Specifications

TAS5630PHD2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed PurePath HD

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 25 V ~ 50 V

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is 607W x 1 @ 2 Ohm; 318W x 2 @ 4 Ohm.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Class D

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TAS5630.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 25 V to 50 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TAS5630PHD.

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 16 A

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 140 mm x 90 mm x 55 mm.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$598.50
$598.50
10
$568.58
$5 685.75
100
$538.65
$53 865.00
500
$508.72
$254 362.50
1000
$478.80
$478 800.00
Top