TAS5631DKD2EVM

Mfr. #: TAS5631DKD2EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TAS5631DKD2
Lifecycle: New from this manufacturer.
Datasheet: TAS5631DKD2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5631DKD2EVM Overview

Product belongs to the PurePath HD series. Output-Type: 1-Channel (Mono) or 2-Channel (Stereo) Voltage Supply Range: 25 V ~ 52.5 V Maximum Output Power of 600W x 1 @ 2 Ohm; 300W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board, Cable, Power Supply. IC package type: TAS5631 Board type: Fully Populated.

TAS5631DKD2EVM Image

TAS5631DKD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5631DKD2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series PurePath HD
  • Output-Type 1-Channel (Mono) or 2-Channel (Stereo)
  • Voltage-Supply 25 V ~ 52.5 V
  • Max-Output-Power-x-Channels-Load 600W x 1 @ 2 Ohm; 300W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board, Cable, Power Supply
  • Utilized-IC-Part TAS5631
  • Board-Type Fully Populated

TAS5631DKD2EVM

TAS5631DKD2EVM Specifications

TAS5631DKD2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed PurePath HD

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 1-Channel (Mono) or 2-Channel (Stereo).

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 25 V ~ 52.5 V

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is 600W x 1 @ 2 Ohm; 300W x 2 @ 4 Ohm.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cable, Power Supply.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TAS5631.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top