THS3095EVM

Mfr. #: THS3095EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR THS3095
Lifecycle: New from this manufacturer.
Datasheet: THS3095EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS3095EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: High Speed Amplifiers Bulk is the packaging method for this product Operational temperature range: -40°C ~ 85°C Output-Type: Single-Ended Voltage supply range: 10 V ~ 30 V, ±5 V ~ 15 V The 235MHz The 7300 V/μs. Current-Output-Channel is 280mA The amplifier is of Current Feedback type. Included item: Board. IC package type: THS3095 Board type: Fully Populated. The product has 1 - Single channel per IC. This product operates at a 10 V to 30 V +/- 5 V to +/- 15 V supply voltage for reliable performance. This tool is designed for the THS3095.

THS3095EVM Image

THS3095EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS3095EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type High Speed Amplifiers
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 10 V ~ 30 V, ±5 V ~ 15 V
  • -3db-Bandwidth 235MHz
  • Slew-Rate 7300 V/μs
  • Current-Output-Channel 280mA
  • Amplifier-Type Current Feedback
  • Supplied-Contents Board
  • Utilized-IC-Part THS3095
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 9.5mA
  • Operating-Supply-Voltage 10 V to 30 V +/- 5 V to +/- 15 V
  • Tool-Is-For-Evaluation-Of THS3095

THS3095EVM

THS3095EVM Specifications

THS3095EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is High Speed Amplifiers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 85°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Single-Ended

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 10 V ~ 30 V, ±5 V ~ 15 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 235MHz.

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed 7300 V/μs

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 280mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Current Feedback.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS3095

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 1 - Single

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 10 V to 30 V +/- 5 V to +/- 15 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is THS3095.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top