| Mfr. #: | THS4012EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MOD FOR THS4012 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | THS4012EVM Datasheet |


Product belongs to the - series. Operational temperature range: 0°C ~ 70°C Output-Type: Single-Ended Voltage supply range: 9 V ~ 32 V, ±4.5 V ~ 16 V The 290MHz The 310 V/μs. Current-Output-Channel is 110mA The amplifier is of Voltage Feedback type. Included item: Board. IC package type: THS4012 Board type: Fully Populated. The product has 1 - Single channel per IC.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4012EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Operating-Temperature?
Q: The product Operating-Temperature is 0°C ~ 70°C.
A: At what frequency does the Output-Type?
Q: The product Output-Type is Single-Ended.
A: What is the Voltage-Supply-Single-Dual of the product?
Q: The Voltage-Supply-Single-Dual of the product is 9 V ~ 32 V, ±4.5 V ~ 16 V.
A: At what frequency does the -3db-Bandwidth?
Q: The product -3db-Bandwidth is 290MHz.
A: What is the Slew-Rate of the product?
Q: The Slew-Rate of the product is 310 V/μs.
A: At what frequency does the Current-Output-Channel?
Q: The product Current-Output-Channel is 110mA.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Voltage Feedback.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed THS4012
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: What is the Channels-per-IC of the product?
Q: The Channels-per-IC of the product is 1 - Single.