THS4141EVM

Mfr. #: THS4141EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR THS4141
Lifecycle: New from this manufacturer.
Datasheet: THS4141EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4141EVM Overview

Product belongs to the - series. Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4 V ~ 33 V, ±2 V ~ 16.5 V The 160MHz The 450 V/μs. Current-Output-Channel is 85mA The amplifier is of Differential type. Included item: Board. IC package type: THS4141 Board type: Fully Populated. The product has 1 - Single channel per IC.

THS4141EVM Image

THS4141EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4141EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4 V ~ 33 V, ±2 V ~ 16.5 V
  • -3db-Bandwidth 160MHz
  • Slew-Rate 450 V/μs
  • Current-Output-Channel 85mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS4141
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 13.2mA

THS4141EVM

THS4141EVM Specifications

THS4141EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed 0°C ~ 70°C

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4 V ~ 33 V, ±2 V ~ 16.5 V

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is 160MHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 450 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 85mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Differential.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS4141

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$96.70
$96.70
10
$91.87
$918.70
100
$87.03
$8 703.45
500
$82.20
$41 099.65
1000
$77.36
$77 364.00
Top