THS4501EVM

Mfr. #: THS4501EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR THS4501
Lifecycle: New from this manufacturer.
Datasheet: THS4501EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4501EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V The 370MHz The 2800 V/μs. Current-Output-Channel is 120mA The amplifier is of Differential type. Included item: Board. IC package type: THS4501 Board type: Fully Populated. The product has 1 - Single channel per IC.

THS4501EVM Image

THS4501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Packaging Bulk
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V
  • -3db-Bandwidth 370MHz
  • Slew-Rate 2800 V/μs
  • Current-Output-Channel 120mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS4501
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 23mA

THS4501EVM

THS4501EVM Specifications

THS4501EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Temperature?

    Q: The product Operating-Temperature is 0°C ~ 70°C.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 370MHz

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 2800 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 120mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Differential.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is THS4501.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top