| Mfr. #: | THS4502EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MOD FOR THS4502 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | THS4502EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V The 370MHz The 2800 V/μs. Current-Output-Channel is 120mA The amplifier is of Differential type. Included item: Board. IC package type: THS4502 Board type: Fully Populated. The product has 1 - Single channel per IC. This tool is designed for the THS4502.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4502EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Kits.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Operating-Temperature?
Q: The product Operating-Temperature is 0°C ~ 70°C.
A: At what frequency does the Output-Type?
Q: The product Output-Type is Differential.
A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?
Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V
A: What is the -3db-Bandwidth of the product?
Q: The -3db-Bandwidth of the product is 370MHz.
A: At what frequency does the Slew-Rate?
Q: The product Slew-Rate is 2800 V/μs.
A: At what frequency does the Current-Output-Channel?
Q: The product Current-Output-Channel is 120mA.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Differential.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed THS4502
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: Is the cutoff frequency of the product Channels-per-IC?
Q: Yes, the product's Channels-per-IC is indeed 1 - Single
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is THS4502.