| Mfr. #: | THS4520EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE FOR THS4520 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | THS4520EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Differential Amplifiers Bulk is the packaging method for this product Operational temperature range: -40°C ~ 85°C Output-Type: Differential, Rail-to-Rail Voltage supply range: 3 V ~ 5.25 V, ±1.5 V ~ 2.625 V The 620MHz The 570 V/μs. Current-Output-Channel is 105mA The amplifier is of Differential type. Included item: Board. IC package type: THS4520 Board type: Fully Populated. The product has 1 - Single channel per IC. This product operates at a 3 V to 5 V supply voltage for reliable performance. This tool is designed for the THS4520.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4520EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Differential Amplifiers
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: At what frequency does the Operating-Temperature?
Q: The product Operating-Temperature is -40°C ~ 85°C.
A: At what frequency does the Output-Type?
Q: The product Output-Type is Differential, Rail-to-Rail.
A: What is the Voltage-Supply-Single-Dual of the product?
Q: The Voltage-Supply-Single-Dual of the product is 3 V ~ 5.25 V, ±1.5 V ~ 2.625 V.
A: At what frequency does the -3db-Bandwidth?
Q: The product -3db-Bandwidth is 620MHz.
A: At what frequency does the Slew-Rate?
Q: The product Slew-Rate is 570 V/μs.
A: What is the Current-Output-Channel of the product?
Q: The Current-Output-Channel of the product is 105mA.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Differential.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is THS4520.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: At what frequency does the Channels-per-IC?
Q: The product Channels-per-IC is 1 - Single.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3 V to 5 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is THS4520.