THS4522EVM

Mfr. #: THS4522EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR THS4522
Lifecycle: New from this manufacturer.
Datasheet: THS4522EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4522EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Differential Amplifiers Bulk is the packaging method for this product Operational temperature range: -40°C ~ 85°C Output-Type: Differential, Rail-to-Rail Voltage supply range: 2.5 V ~ 5.5 V, ±1.25 V ~ 2.75 V The 145MHz The 600 V/μs. Current-Output-Channel is 55mA The amplifier is of Differential type. Included item: Board. IC package type: THS4522 Board type: Fully Populated. The product has 2 - Dual channel per IC. This product operates at a 2.5 V to 5.5 V +/- 1.25 V to 2.75 V supply voltage for reliable performance. This tool is designed for the THS4522. 1.1 mA is 92 nA.

THS4522EVM Image

THS4522EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4522EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Differential Amplifiers
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential, Rail-to-Rail
  • Voltage-Supply-Single-Dual 2.5 V ~ 5.5 V, ±1.25 V ~ 2.75 V
  • -3db-Bandwidth 145MHz
  • Slew-Rate 600 V/μs
  • Current-Output-Channel 55mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS4522
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC 1.14mA
  • Operating-Supply-Voltage 2.5 V to 5.5 V +/- 1.25 V to 2.75 V
  • Tool-Is-For-Evaluation-Of THS4522
  • Operating-Supply-Current 1.1 mA

THS4522EVM

THS4522EVM Specifications

THS4522EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Differential Amplifiers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Differential, Rail-to-Rail

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 2.5 V ~ 5.5 V, ±1.25 V ~ 2.75 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 145MHz.

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed 600 V/μs

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 55mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Differential.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS4522

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 2 - Dual.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.5 V to 5.5 V +/- 1.25 V to 2.75 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed THS4522

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 1.1 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$141.02
$141.02
10
$133.97
$1 339.70
100
$126.92
$12 691.86
500
$119.87
$59 933.80
1000
$112.82
$112 816.60
Top