TLK10232EVM

Mfr. #: TLK10232EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TLK10232
Lifecycle: New from this manufacturer.
Datasheet: TLK10232EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK10232EVM Overview

Product belongs to the TLK10232 series. This product is categorized as Evaluation Modules Type: Ethernet Transceivers This product is designed TLK10232 amplifier. The Interface, Transceiver is the Main-Purpose. Primary-Attributes: - IC package type: TLK10232 This product is an Custom-developed GUI and a detailed EVM user guide. This tool is designed for the TLK10232. GUI interface type

TLK10232EVM Image

TLK10232EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK10232EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TLK10232
  • Product Evaluation Modules
  • Type Ethernet Transceivers
  • For-Use-With TLK10232
  • Main-Purpose Interface, Transceiver
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TLK10232
  • Description-Function Custom-developed GUI and a detailed EVM user guide
  • Tool-Is-For-Evaluation-Of TLK10232
  • Interface-Type GUI

TLK10232EVM

TLK10232EVM Specifications

TLK10232EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TLK10232.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Ethernet Transceivers.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TLK10232.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Transceiver.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TLK10232

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Custom-developed GUI and a detailed EVM user guide

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TLK10232.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is GUI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$4.00
$4.00
10
$4.00
$40.00
100
$4.00
$400.00
500
$3.00
$1 500.00
1000
$3.00
$3 000.00
Top