TMP103EVM

Mfr. #: TMP103EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Temperature Sensor Development Tools TMP103 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TMP103EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP103EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1°C Interface: I2C, USB Voltage Supply Range: 5V, USB Temperature Sensing range of -40°C ~ 125°C Included item: Board, Cables. IC package type: TMP103 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.4 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TMP103. I2C SMBus interface type

TMP103EVM Image

TMP103EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP103EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1°C
  • Interface I2C, USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents Board, Cables
  • Embedded No
  • Utilized-IC-Part TMP103
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.4 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TMP103
  • Interface-Type I2C SMBus

TMP103EVM

TMP103EVM Specifications

TMP103EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±1°C

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C, USB

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 5V, USB.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Cables

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP103.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.4 V to 3.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP103.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C SMBus

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top