TMP112EVM

Mfr. #: TMP112EVM
Manufacturer: Texas Instruments
Description: Sensor Development Tools Temperature Sensor Development Tools TMP112EVM
Lifecycle: New from this manufacturer.
Datasheet: TMP112EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP112EVM Overview

Product belongs to the TMP112 series. This product is categorized as Evaluation Boards Type: Temperature Sensors This product is designed SM-USB-DIG amplifier. Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP112 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP112.

TMP112EVM Image

TMP112EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP112EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP112
  • Product Evaluation Boards
  • Type Temperature Sensors
  • For-Use-With SM-USB-DIG
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded No
  • Utilized-IC-Part TMP112
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TMP112

TMP112EVM

TMP112EVM Specifications

TMP112EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is TMP112.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensors

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is SM-USB-DIG.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±1°C

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed -

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TMP112.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP112.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$148.50
$148.50
10
$141.08
$1 410.75
100
$133.65
$13 365.00
500
$126.22
$63 112.50
1000
$118.80
$118 800.00
Top