TPA2000D2EVM

Mfr. #: TPA2000D2EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR TPA2000D2
Lifecycle: New from this manufacturer.
Datasheet: TPA2000D2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2000D2EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 4.5 V ~ 5.5 V Maximum Output Power of 2W x 2 @ 3 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2000D2 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA2000D2.

TPA2000D2EVM Image

TPA2000D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2000D2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 4.5 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 2W x 2 @ 3 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Output-Power 2 W
  • Utilized-IC-Part TPA2000D2
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of TPA2000D2

TPA2000D2EVM

TPA2000D2EVM Specifications

TPA2000D2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifiers.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is 2-Channel (Stereo).

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 4.5 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 2W x 2 @ 3 Ohm

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class D.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPA2000D2.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V to 15 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPA2000D2.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top