TPL5100EVM

Mfr. #: TPL5100EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR TPL5100
Lifecycle: New from this manufacturer.
Datasheet: TPL5100EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL5100EVM Overview

Product belongs to the TPL5100 series. This product is categorized as Evaluation Boards Type: Clock and Data Retiming Bulk is the packaging method for this product This product is designed C2000 MSP430 Stellaris amplifier. The Timing, Timer is the Main-Purpose. Primary-Attributes: Watchdog Timer IC package type: TPL5100 This product is an Allows designers to configure delay timers on the TPL5100 and measure very low current consumption. This tool is designed for the TPL5100.

TPL5100EVM Image

TPL5100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL5100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TPL5100
  • Product Evaluation Boards
  • Type Clock and Data Retiming
  • Packaging Bulk
  • For-Use-With C2000 MSP430 Stellaris
  • Main-Purpose Timing, Timer
  • Primary-Attributes Watchdog Timer
  • Embedded No
  • Utilized-IC-Part TPL5100
  • Description-Function Allows designers to configure delay timers on the TPL5100 and measure very low current consumption
  • Tool-Is-For-Evaluation-Of TPL5100

TPL5100EVM

TPL5100EVM Specifications

TPL5100EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TPL5100

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Clock and Data Retiming.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is C2000 MSP430 Stellaris.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Timer.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Watchdog Timer.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPL5100.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Allows designers to configure delay timers on the TPL5100 and measure very low current consumption.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPL5100

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$23.14
$23.14
10
$21.99
$219.88
100
$20.83
$2 083.05
500
$19.67
$9 836.65
1000
$18.52
$18 516.00
Top