| Mfr. #: | TPS2392EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE FOR TPS2392 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TPS2392EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2392 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2392. Our product measures 119.6 mm x 91.4 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2392EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Hot Swap Voltage Controllers.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TPS2392.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TPS2392.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 119.6 mm x 91.4 mm.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is - 48 V.