TPS2393EVM

Mfr. #: TPS2393EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TPS2393
Lifecycle: New from this manufacturer.
Datasheet: TPS2393EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2393EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2393 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2393. Our product measures 119.6 mm x 91.4 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

TPS2393EVM Image

TPS2393EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2393EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Main-Purpose Power Management, Hot Swap Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2393
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Tool-Is-For-Evaluation-Of TPS2393
  • Dimensions 119.6 mm x 91.4 mm
  • Input-Voltage - 48 V

TPS2393EVM

TPS2393EVM Specifications

TPS2393EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Hot Swap Controller

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS2393

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS2393.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 119.6 mm x 91.4 mm.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed - 48 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top