TPS40060EVM

Mfr. #: TPS40060EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR TPS40060
Lifecycle: New from this manufacturer.
Datasheet: TPS40060EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40060EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Switching Controllers Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 10 V ~ 55 V voltage input This product features 'Frequency-Switching' at 250kHz for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: TPS40060 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS40060. Our product measures 61 mm x 53.3 mm in dimensions for compact and convenient use. Input Voltage Range: 10 V to 55 V

TPS40060EVM Image

TPS40060EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40060EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Switching Controllers
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 10 V ~ 55 V
  • Frequency-Switching 250kHz
  • Current-Output 4A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS40060
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS40060
  • Dimensions 61 mm x 53.3 mm
  • Input-Voltage 10 V to 55 V

TPS40060EVM

TPS40060EVM Specifications

TPS40060EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 10 V ~ 55 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 250kHz

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 3.3V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS40060.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Non-Isolated.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS40060

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 61 mm x 53.3 mm

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 10 V to 55 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$9.42
$9.42
10
$8.95
$89.49
100
$8.48
$847.80
500
$8.01
$4 003.50
1000
$7.54
$7 536.00
Top